Share via:
WORKS to stabilise the beach embankment at Illaroo Road, Lake Cathie, were expected to wrap up this week.
Port Macquarie-Hastings Council has been working at the southern end, adjacent to the beach and dune area, to stabilise the edge of the road.
The work has involved installing four-tonne bags of rocks to act as medium-term supports until a long-term solution is actioned through Council’s Coastal Management Plan.
It is part of a wide-ranging program of road rehabilitation works that will continue through to June.
Pavement stabilisation works are also scheduled for the following locations:
—Lorne Road, Kendall: from 50 metres west of Logans Crossing Road to approximately 200 metres west.
—Sancrox Road, Sancrox: from Frogs Roundabout westbound for one kilometre.
—Rolland Plains Road, Telegraph Point: between the Old Pacific Highway and Hidden Valley Road.
—Lake Innes Drive, Lake Innes: from 700 metres south-east of Tall Timbers Road to the start of the 2024–25 rehabilitation area
—Blackbutt Drive, Wauchope: between Cameron Street and Peppermint Crescent.
—Comboyne Street, Kendall: between numbers 21 and 55.
Council describes pavement stabilisation as a process that strengthens the existing road base by treating and reusing materials already in place, followed by a new sealed surface.
The approach improves driving conditions, extends the life of the road and reduces the need for future reactive maintenance.
You can help your local paper.
Make a small once-off, or (if you can) a regular donation.
We are an independent family owned business and our newspapers are free to collect and our news stories are free online.
Help support us into the future.
Share via:




